Skip to content
Licensed & Insured
4.9/5 from 847+ reviews

Professional IT Relocation Services in Dubai

Specialized IT equipment movers with expertise in server rooms, data centers, and sensitive technology. Minimal downtime, maximum security.

Serving Dubai and surrounding areas
Licensed & InsuredSame-Day QuotesAll Dubai Areas

4.9/5

847+ Reviews

Licensed

Fully Insured

5,000+

Moves Completed

15+ Years

In Dubai

Why Choose Us

Licensed since 2010. 4.9/5 rating from 847+ verified reviews.

Full Coverage

Licensed & Insured

4.9/5

Customer Rating

5,000+

Moves Completed

15+

Years in Dubai

98%

On-Time Rate

4.9

Rated 4.9/5 based on 523+ verified customer reviews

Serving Dubai since 2010

Expert IT Infrastructure Relocation

IT relocations require meticulous planning, specialized knowledge, and precision execution. Our IT relocation division specializes in moving server rooms, data centers, network equipment, and all technology infrastructure for Dubai businesses. We understand that your IT systems are the backbone of your operations, which is why we employ certified technicians, follow industry best practices, and coordinate closely with your IT team throughout the process.

Our IT relocation service goes beyond simply moving equipment. We provide comprehensive planning including network mapping, detailed disconnection and reconnection procedures, anti-static packing materials, climate-controlled transportation, and systematic testing post-relocation. We work with your IT department or managed service provider to minimize downtime - often completing moves over weekends or after-hours. With specialized insurance for technology equipment and detailed documentation of every step, your IT infrastructure is in expert hands.

Pricing & Packages

Transparent pricing for it relocation dubai. No hidden fees.

Small IT Setup

Small office networks and workstations

From
AED 3,000- 6,000
  • Up to 15 workstations
  • Basic network equipment
  • 3-4 IT moving specialists
  • Cable labeling system
  • Basic documentation
  • Insurance up to AED 50,000
  • Weekend service available
  • Reconnection assistance
  • Testing support
Get Quote
Most Popular

Medium IT Infrastructure

Server rooms and business networks

From
AED 8,000- 20,000
  • Up to 50 workstations
  • Server room relocation
  • 5-6 certified specialists
  • Complete cable mapping
  • Photo documentation
  • Anti-static packing
  • Climate-controlled transport
  • Insurance up to AED 150,000
  • After-hours moving
  • Full reconnection service
  • Network testing
  • IT coordinator liaison
Get Quote

Data Center Relocation

Enterprise IT and data centers

From
AED 25,000
  • 50+ workstations
  • Full data center moving
  • 8+ certified technicians
  • Comprehensive network mapping
  • Video documentation
  • Server rack relocation
  • Redundancy planning
  • Insurance up to AED 500,000+
  • 24/7 moving capability
  • Complete commissioning
  • Post-move support
  • IT project manager
  • Vendor coordination
  • Disaster recovery alignment
Get Quote

What Affects Your Price?

Property size and type
Volume of belongings
Distance between locations
Floor level and elevator access
Packing requirements
Special items (piano, art, safes)
Move date and timing

Get a free, no-obligation quote. We visit your property, assess your needs, and provide a detailed breakdown.

Prices shown are estimates. Final pricing is based on a free assessment of your specific needs.

Our Process

How we make your move seamless and stress-free

1

IT Infrastructure Assessment

We assess your IT setup, create network diagrams, document current configurations, and develop a detailed relocation plan with your IT team.

2

Preparation & Documentation

All equipment is photographed and documented. We create cable maps, label every connection, backup critical data, and prepare equipment for transport.

3

Secure Relocation

Using anti-static materials and climate-controlled vehicles, we transport equipment safely. Real-time GPS tracking provides full visibility.

4

Reinstallation & Testing

Equipment is installed per network diagrams, all connections verified, systems tested, and we work with your IT team until everything is operational.

What's Included

Everything you need for a successful it relocation dubai move

Server room specialists
Data center relocation
Network equipment handling
Cable mapping & labeling
Anti-static packing materials
Climate-controlled transport
After-hours moving
Minimal downtime approach
IT technician coordination
Equipment testing protocols
Comprehensive documentation
Specialized IT insurance

IT Relocation Dubai Across Dubai

We provide it relocation dubai services across all major Dubai areas

Headquartered in Dubai, serving all major communities

What to Expect

Clear expectations so you know exactly what to expect from our moving service

What We Promise

  • Professional, trained moving crew
  • Careful handling of your belongings
  • All-inclusive pricing with no hidden fees
  • Insurance coverage for your items
  • Building access and permit coordination
  • On-time arrival on scheduled move date

What We Can't Guarantee

  • Exact move duration (depends on access and volume)
  • Guarantees against all damage (though we minimize risk)
  • Same-day availability during peak season
  • Fixed prices without property assessment

Variables to Consider

  • Elevator availability affects timing
  • Building management approval for permits
  • Traffic conditions for transport duration
  • Weather conditions for outdoor items

Move duration estimates are approximate. Actual time depends on property access, elevator availability, and item volume.

Frequently Asked Questions

Common questions about it relocation dubai

IT relocation costs in Dubai vary based on infrastructure complexity. Small office IT setups (up to 15 workstations) cost AED 3,000-6,000. Medium business networks with server rooms (up to 50 workstations) range from AED 8,000-20,000. Large enterprise IT and data center relocations start from AED 25,000. Costs depend on: number of servers and network devices, complexity of cabling, specialized equipment (SANs, UPS systems), downtime tolerance, and any required upgrades during the move. We provide detailed quotes after technical assessment.
We employ several strategies to minimize downtime: detailed pre-planning with your IT team to identify critical systems, phased migration where we move non-critical systems first, after-hours and weekend moves to avoid business hours, parallel setup where we configure new infrastructure before cutover, and redundancy planning using temporary backup systems if needed. Most IT relocations can be completed with 4-12 hours of downtime for critical systems, often scheduled for weekends. We also coordinate with cloud service providers for temporary failover if you use hybrid infrastructure.
Yes, our IT relocation team includes professionals with relevant certifications and experience. While our movers handle the physical moving, we work closely with your IT department or managed service provider for all technical work like disconnection, reconnection, and testing. We can also arrange certified IT technicians through our partner network if you need additional technical support. Our project managers have IT infrastructure experience and understand networking, server systems, and data center operations to coordinate effectively.
IT equipment receives specialized protection: anti-static bubble wrap and bags for sensitive electronics, original manufacturer packaging when available, custom foam padding for servers and network equipment, climate-controlled vehicles maintaining optimal temperature and humidity, shock-absorbing materials for hard drives and delicate components, and secure mounting in vehicles to prevent movement. Server racks can be moved intact or equipment can be individually packed depending on distance and road conditions. We also maintain insurance specifically for electronic equipment.
Cable management is critical for IT relocations. Our process includes: photographing all connections before disconnection, labeling both ends of every cable with matching reference numbers, creating detailed cable maps and network diagrams, using color-coded labels for different cable types (network, power, fiber), bagging and labeling all loose cables and adapters, and documenting patch panel configurations. At the new location, we use these maps and labels to ensure accurate reconnection. This systematic approach eliminates confusion and reduces commissioning time significantly.
Yes, weekend server room relocations are our specialty. A typical timeline: Friday evening - begin disconnection and packing after business hours, Saturday - complete packing, transport equipment, begin installation at new location, Sunday - complete installation, reconnection, and testing, Monday morning - business resumes with minimal disruption. For complex server rooms, we may start prep work during the week and execute the main move over the weekend. Our teams are experienced in working efficiently during compressed timeframes while maintaining quality and safety standards.

Ready to Get Started with IT Relocation Dubai?

Get a free, no-obligation quote for your move today. Our team is ready to help you.

CallWhatsAppQuote